PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing sprinkler branches at the 1st floor  Facing West.jpg Preping for the slab on grade Facing North.jpg Duct work up through the lower roof Facing South.jpg Temporary lighting at the 4th floor Facing North.jpg Metal framing around the perimeter of the lower roof Facing West.jpg Setting up the scafold at Stair -2 shear wall Facing North.jpg
Previous pageNext page Metal framing around the perimeter of the lower roof Facing West
Metal framing around the perimeter of the lower roof Facing West